Custom Home Builders Mississauga

The Clock Starts When the Old House Comes Down

When a new custom house replaces an old one in Mississauga, the City links the two, and the foundation is where a replacement house wins or loses time.

Floor assembly landing on ICF walls

New Builds in ICF

The full service: how we build a custom home in insulated concrete from footing to roofline.

See the New Builds service →

In Mississauga, the teardown and the new house are one permit story

Anyone talking to custom home builders Mississauga homeowners recommend will hear about design first. The City of Mississauga starts somewhere else. Its Demolition Control By-law 45-19 designates the entire city as a demolition control area, and no one may demolish a residential property in it without a demolition control permit. The by-law exists, in Council's own words, to prevent the premature loss of housing stock and the creation of vacant land.

For a replacement house, the by-law sets the order of operations. A demolition control permit is issued where a building permit has already been issued for the replacement building on the same site. So the new house gets its permit first, and only then does the old one come down. For a property with fewer than six units, the Chief Building Official issues the demolition permit, with the owner's consent to any conditions attached to it.

We are DMT Building Group. We build custom homes in insulated concrete form (ICF) from the footings to the roofline, with our own crews doing the concrete. We are based in Barrie, Ontario, and build across the Greater Toronto Area, including Mississauga. Our Teardown & Rebuild project is the kind of site this page is about: an old house out, and new engineered footings and foundation formed tight between the neighbours.

The conditions that can come with a Mississauga demolition permit

Section 11 of the Mississauga by-law lists the conditions the City may impose. They are not guaranteed to appear on every permit, but every owner of custom homes Mississauga is about to tear down should read them before signing anything:

1. Building permit for the new house 2. Demolition control permit 3. Demolition begins the clock starts 4. Substantially complete by the permit date: not less than 2 years Late: up to $20,000 per demolished unit added to the tax roll, a lien on the land
Where conditions are imposed. Source: City of Mississauga Demolition Control By-law 45-19, sections 2, 3, 7, 8 and 11.

Two years is a reasonable runway for a single house. It gets shorter in practice when the excavation hits something unexpected, when a foundation waits for good weather, or when the structure is waiting on three trades who each wait on the one before. That is the part of a Mississauga schedule where who builds the structure, and how, actually matters.

Whole cityMississauga is one demolition control area under By-law 45-19
2 yearsMinimum completion window a demolition permit may set
$20,000Most that can be added to the tax roll per demolished unit
10 unitsAt or below this, no site plan approval for housing

Why the structure is where custom home builders in Mississauga win or lose time

An ICF wall puts the concrete structure, the continuous insulation and the surface the finishes fasten to into one wall cycle. Our crews self-perform the footings, the foundation, the walls and the waterproofing, so there is no hand-off between a foundation sub, a framer and an insulator on the part of the house the demolition clock is really measuring.

We also keep building through the winter. Our crews detail and pour ICF walls in February, under insulated tarps when the weather calls for it, which on a Mississauga replacement house means a demolition in the fall does not have to wait for spring before the foundation goes in. If you want to see how that is done, our post on pouring concrete in winter covers it.

And infill lots are tight. On our Teardown & Rebuild site the neighbours were a few metres away on both sides, machine access was limited, and the spoil had to leave the site. We sequenced the excavation and forming so the hole stayed open for as little time as possible. On a Mississauga street of existing houses, that is most of the job.

What the new house can be: no site plan, but tight infill limits

The good news for anyone choosing between home builders in Mississauga is that a single replacement house does not need site plan approval. The City's Site Plan Control By-law 0293-2006 exempts residential development of 10 units or less. There is no Mississauga design panel to win over.

The zoning still has the last word, and in many of Mississauga's established neighbourhoods it says more than the base rules. Where an R1 exception zone applies the infill regulations in Table 4.2.2 of Zoning By-law 0225-2007, the new house is held to a lower envelope than the 10.7 m base height for R1 to R5:

Average grade 10.7 m base maximum, R1 to R5 Ridge 9.5 m (frontage 22.5 m+) or 9.0 m Eaves 6.4 m Flat roof 7.5 m Sloped roof Flat roof
Not to scale. Source: City of Mississauga Zoning By-law 0225-2007, Table 4.2.1 (R1 to R5) and Table 4.2.2 (R1 infill exception regulations), applying where an exception zone such as R1-1, R1-2 or R1-3 calls for them.

The same table caps gross floor area at 190 m² plus 0.20 times the lot area, limits dwelling unit depth to 20.0 m, and allows a garage to project 0.0 m beyond the front wall of the first storey. A new house there is designed inside a box the zoning has already drawn. That is one more reason to settle the design, and the structure that carries it, before demolition starts rather than after.

Before the excavator: what a Mississauga replacement house needs lined up

Each of these is on the City's own checklists or the relevant authority's pages. Each one is cheaper to settle while the old Mississauga house is still standing.

The new house permit

Through ePlans: a site plan with site statistics, a grading plan, floor plans with foundation specifications, the Applicable Law Form, the SB-12 energy summary and the Single Dwelling Unit Information Letter.

Trees on the lot

A Mississauga permit is needed to injure or remove any private tree 15 cm or more in diameter, and the City requires arborist reports for construction projects. One replacement tree per 15 cm of trunk removed.

The creek and the lake

Credit Valley Conservation regulates most of Mississauga, TRCA the Etobicoke and Mimico creek watersheds. Near a valley, floodplain, wetland or the Lake Ontario shore, either may require its own permit.

Charges and credits

Development charges are paid before the permit is issued. The City notes a demolition credit may apply where residential units are demolished and replaced, subject to time limits in the by-laws.

One more check before you buy or design: Mississauga has three heritage conservation districts, Meadowvale Village, Old Port Credit Village and Streetsville, and more than a thousand listed heritage properties. Demolition in or of one of those is a different conversation.

Replacement houses and tight lots, on site

Choosing a custom home builder in Mississauga

When you interview a custom home builder Mississauga neighbours have used, ask three questions this page should have made obvious. Who pours the foundation, and are they on the builder's payroll or a sub? What happens to the schedule if demolition finishes in November? And has the design been checked against the infill limits for your zone before anyone books a demolition date?

Our answers are short. Our own crews pour it. We work through the winter. And we go through your plans early, mark what an engineer needs to look at, and sort out the ICF conversion so the structure we pour is the one that was permitted. The person you deal with from the first site walk to the last pour is the owner, Jerry Townsend, who has been building in ICF for more than twenty years. We are certified on Nudura, Amvic, Element and Fox, and a typical house lands on a 6 or 8 inch core. For the cost side, start with what ICF actually costs.

  1. 1

    Check the lot

    Your Mississauga zone, infill exception, trees, CVC or TRCA, heritage. All of it while the old house still stands.

  2. 2

    Permit the new house

    Design inside the zoning envelope and get the building permit through ePlans first.

  3. 3

    Then demolish

    The demolition control permit follows the building permit, along with any completion date.

  4. 4

    Footings to roofline

    Our crews excavate, form and pour the foundation and raise the ICF walls, winter or not.

Custom Home Builders in Mississauga — FAQs

Can I demolish my house in Mississauga before I have a permit for the new one?

Under Demolition Control By-law 45-19, the whole city is a demolition control area. A demolition control permit is issued where a building permit has been issued for the replacement building, so the new house is normally permitted first.

Is there a deadline to finish the new house?

There can be. The City may require the replacement to be substantially complete by a date in the permit, no sooner than two years after demolition begins, and may add up to $20,000 per demolished unit to the tax roll if it is late.

Does a new single house need site plan approval in Mississauga?

Generally no. Site Plan Control By-law 0293-2006 exempts residential development of 10 units or less. The house must still meet the Zoning By-law.

How tall can a new house be?

The base maximum in R1 to R5 is 10.7 m. Where the R1 infill exception applies, a sloped roof ridge is capped at 9.5 m or 9.0 m depending on frontage, a flat roof at 7.5 m and eaves at 6.4 m.

Do development charges apply to a replacement house?

Charges are paid before the building permit is issued. The City notes a demolition credit may apply where residential units are demolished and replaced, subject to the expiry dates in the by-laws.

Are you based in Mississauga?

No. We are based in Barrie and build across the Greater Toronto Area, including Mississauga.

Where to go next

Replacing a house in Mississauga?

Send us the address and whatever drawings you have. We will walk the lot with you, look at access and the neighbours, and come back with an itemized quote before anything comes down.

  • Free consultation & itemized quote
  • 50+ years of combined ICF experience
  • Our own crews — we self-perform the concrete scope

Prefer to talk? 705-333-3329 · info@dmtbuilding.ca

Request your free quote

One short form — the property, what you're planning, and any drawings or site photos you have. We'll come back with straight answers.

Start my free quote

Or talk to us now — 705-333-3329
Monday–Friday, 7 a.m.–5 p.m. · Closed weekends