New Home Builders East Gwillimbury

Two Kinds of New Home Are Going Up Here. We Build One of Them.

Many people looking for a new house in East Gwillimbury want one in a new subdivision. We do not sell those. We build custom homes in insulated concrete on single lots, and we build foundations for the builders who do the rest.

A finished ICF home from the air

New Builds in ICF

A custom home in insulated concrete, built from the footings to the roofline.

See the New Builds service →

Which new home are you looking for?

If you searched for new home builders East Gwillimbury, there is a fair chance you want a house in one of the new subdivisions: pick a lot, pick a model, close on a date. We are not that kind of builder, and it is better to say so in the first paragraph than the last. DMT Building Group builds custom homes in insulated concrete form (ICF), one at a time, from the footings to the roofline, and builds footing and foundation packages for other builders.

The Town of East Gwillimbury treats these as different jobs too, and it is worth seeing how. A house going up in a subdivision the Town has not yet taken over carries one set of paperwork. A house going up on its own lot, especially a rural one without municipal water and sewer, carries a completely different one. Both are new homes in East Gwillimbury. They do not share many of the same questions.

Our office is in Barrie, Ontario. East Gwillimbury is one of the Greater Toronto Area towns on the service area we publish, and our own crews do the site prep, footings, foundation and ICF walls.

How East Gwillimbury's paperwork splits the two

In a new subdivision sold by the subdivision's builder On its own lot custom, often rural or unserviced Unassumed until the Town takes over sidewalks, curbs, streetlights, grading Builder stays responsible until the subdivision is assumed Grading deposit held by the builder at risk if grading is changed Tarion warranty at risk from unauthorized alterations MDS calculation within 1,500 m of a livestock building Septic permit and five-yearly inspections near the lake Wellhead protection areas around the Town's listed wells Water and wastewater DCs deferred Town components, until servicing arrives This is where we build custom homes This is where we build for builders
Two kinds of new home, two sets of Town requirements. Sources: Town of East Gwillimbury Acknowledgement of Unassumed Property; Minimum Distance Separation handout (August 2019); Sewage System Maintenance Program page; DC Deferral Policy for Development on Lands without Municipal Servicing (FIN2025-02, effective April 15, 2025).

The left column is East Gwillimbury's Acknowledgement of Unassumed Property, a form an owner signs to proceed with work in a subdivision the Town has not yet assumed without the builder's consent. It says the builder or developer remains responsible for sidewalks, curbs, streetlights and grading until assumption, and lists the risks plainly: losing the grading deposit held by the builder, having to remove work to correct grading, losing the Tarion warranty through unauthorized alterations, and paying for damage to municipal infrastructure. That is the world of the East Gwillimbury subdivision builder. The right column is ours.

Building on your own lot in East Gwillimbury

A one-off house in East Gwillimbury, outside the new subdivisions, meets four Town requirements that a subdivision buyer never sees.

The farm next door

Minimum Distance Separation, an Ontario formula the Town applies, is required for a proposed dwelling within 1,500 metres of any building used for livestock. The MDS I calculation forms part of a complete building permit application.

The septic system

East Gwillimbury's building permits cover installing or altering a private sewage system. A new house without sewer needs one, designed and installed as its own permitted work.

Inspections near water

The Province requires septic systems within 100 metres of the Lake Simcoe shoreline or watercourses in its watershed, or near a York Region drinking water well, to be inspected every five years.

Wellhead protection

East Gwillimbury lists six well sites with Wellhead Protection Areas, including on Mount Albert Road, Queensville Sideroad, Centre Street and Leslie Street.

The septic system also shapes the site plan more than people expect. East Gwillimbury's own maintenance advice says not to drive or park on a leaching bed, not to build a deck or driveway over the tank, and not to change the property's drainage. On a new build, that means the bed, the tank, the driveway and the excavation for the house all get placed together, before the first footing is laid out. It is one of the reasons we walk a rural East Gwillimbury lot before we quote it.

1,500 mMDS trigger distance from a livestock building
100 mSeptic inspection zone around Lake Simcoe waters
48 hrsTown's target to attend an inspection
$153,353Total DCs, single detached, July 1, 2026

The development charges, and the part that can wait

East Gwillimbury collects development charges for itself, for York Region and for the two school boards, and they are calculated when the building permit is issued. The Town's rate schedule effective July 1, 2026 lists $153,353 for a single or semi-detached dwelling: $59,701 Town, $84,718 York Region and $8,934 for the school boards.

Development charges, single detached (July 1, 2026) Town $59,701 red: water $1,895 + wastewater $6,217, deferrable York Region $84,718 School boards $8,934 Total $153,353 per unit
Source: Town of East Gwillimbury Development Charges Rate Schedule, effective July 1, 2026; Development Charge Deferral Policy for Development on Lands without Municipal Servicing. Town rates are indexed every January 1 and July 1.

The part that matters for a rural lot is in East Gwillimbury's deferral policy, approved by Council and effective April 15, 2025. The Town says it would be premature to charge the water and wastewater components of its development charges on land that has no municipal water or sewer. On qualifying unserviced land, those components are deferred until the property connects, with payment due within 60 days of servicing being made available. The policy covers the Town's own charges, not area-specific ones; on the July 2026 schedule that is $8,112. It does not apply to land that is serviced where the owner would simply prefer not to connect, and a Deferral Acknowledgement has to be signed before the permit is issued. Confirm the current figures and your eligibility with the Town for your address.

New home builders in East Gwillimbury Ontario, below grade

The other half of our work in East Gwillimbury would be invisible to buyers. Most of the calls our owner takes come from builders who already know ICF, and builders and developers bring us in for repeat foundation and structural packages, scheduled around their build calendar. They take over a level, square, backfill-ready foundation and carry on from there. Our partners page names builders we work alongside, including Pine Glen Homes and Ballantyne Builds, and our gallery shows ICF going up through the snow at Highbourne, for Nobility Homes.

Our Pebble Ridge story is the clearest example of that scale: long runs of strip footing, deep reinforced pads and grade beams, laid out and checked against the engineering at every stage, because everything above depends on it. If you are one of the new home builders in East Gwillimbury Ontario looking for a below-grade crew, that is the conversation to have with us.

If you are an East Gwillimbury owner, the same crews build your whole house. We review your drawings, flag anything that needs an engineer, then do site prep, footings, a full-height ICF foundation and the above-grade ICF walls, and coordinate the floor and roof assemblies with our network of trades and suppliers.

What East Gwillimbury's permit process looks like

Each step is from the Town's own Building Permits page.

  1. 1

    Check the zoning

    Zoning By-law 2018-043 sets setbacks, size and height. A minor variance takes two to three months; a rezoning, four to six.

  2. 2

    Pre-screening

    Submissions are pre-screened for completeness. The application date is the date pre-screening is approved, not the date you sent it.

  3. 3

    Other agencies

    LSRCA for environmentally sensitive areas, the MTO near highway corridors, and a tree permit where it applies.

  4. 4

    Build and inspect

    Permit card and approved plans on site. Inspectors attend within 48 hours of a request, weekends and holidays excluded.

East Gwillimbury is also partway through a Zoning By-law Conformity Update to bring the by-law in line with new legislation and its proposed Official Plan, so check whether anything affecting your lot is changing before the design is final.

From a cleared lot to walls up, the way an East Gwillimbury build runs

Why build a one-off house in ICF here

If you are building an East Gwillimbury house to stay in, that is the case for building it in insulated concrete: an effective R-22 to R-26 wall with no studs to bridge the insulation, a reinforced concrete core, and a structure that is quieter than a framed one. Wall-for-wall, ICF usually costs a modest premium over framing; our post on what ICF actually costs sets out where it goes.

The person you deal with is the owner, Jerry Townsend, who has been building in ICF for more than twenty years, from the first site walk to the last pour. If what you want is a model home in an East Gwillimbury subdivision, the subdivision's own builder is the right call.

New Home Builders East Gwillimbury — FAQs

Do you sell homes in East Gwillimbury subdivisions?

No. We build custom homes in ICF on individual lots, and we build footings and foundations for builders. For a house in a new subdivision, the subdivision's builder is who you buy from.

What does "unassumed" mean for a new East Gwillimbury home?

The Town has not yet accepted responsibility for the subdivision's sidewalks, curbs, streetlights and grading, so the builder or developer still holds them. The Town warns that changes made without the builder's consent can cost the grading deposit or the Tarion warranty.

Is there a farm setback for a new house in East Gwillimbury?

Yes. A Minimum Distance Separation calculation is required for a proposed dwelling within 1,500 metres of any building used for livestock, and it forms part of a complete building permit application.

Are development charges lower on a lot without town water and sewer?

Under the Town's deferral policy, the water and wastewater components of its own development charges are deferred on qualifying unserviced land until the property connects. Other components are paid as usual.

How quickly are building inspections done?

The Town says staff attend within 48 hours of a request, excluding weekends and holidays.

Are you based in East Gwillimbury?

No. Our office is in Barrie, and East Gwillimbury is one of the Greater Toronto Area towns on our published service area.

Where to go next

Building a new home in East Gwillimbury?

Send us the lot and whatever drawings you have, or the foundation package if you are a builder. We will walk the site and come back with an itemized quote for the ICF work.

  • Free consultation & itemized quote
  • 50+ years of combined ICF experience
  • Our own crews — we self-perform the concrete scope

Prefer to talk? 705-333-3329 · info@dmtbuilding.ca

Request your free quote

One short form — the property, what you're planning, and any drawings or site photos you have. We'll come back with straight answers.

Start my free quote

Or talk to us now — 705-333-3329
Monday–Friday, 7 a.m.–5 p.m. · Closed weekends